St. Mark
With an existing 750 seat worship center no longer viable for this urban parish, the architect was asked to lead a program to re-envision the parish. After many workshop sessions the design of the new 1500 seat worship facility was realized.
Principal in charge: Gregory M. Davis, AIA
St. Peter
The site included 17 structures that dated from 1861 to the present. The design was developed to retain the original towers of the church that was built in 1923 and approximately 75% of the remaining structure.
Principal in charge: Gregory M. Davis, AIA
St. Bridget
After a formal Feasibility Study the “Dream of a New Sanctuary” turned to renovation. A parish was developed with a new vision for the renovation of the existing building.
Principal in charge: Gregory M. Davis, AIA
St. Margaret Mary
This suburban parish had a need to expand its existing sanctuary seating from 800 to 1200 seats. This new facility was to bring the community into a space that reflects its history and the importance.
Principal in charge: Gregory M. Davis, AIA